Intensjonskunngjøring · 20.06.2025
Bridge renewal construction work – Intention notice - R&D project - Record change on bridges
ROGALAND FYLKESKOMMUNE i Stavanger publiserte denne kunngjøringen i TED 20.06.2025.
- Type
- Intensjonskunngjøring
- Publisert
- 20.06.2025
- Oppdragsgiver
- ROGALAND FYLKESKOMMUNE
- Sted
- Stavanger
- Art
- Bygge- og anleggsarbeid
- CPV-koder
- 45000000, 45221000, 45221100, 45221119, 73000000
- TED-nummer
- 399447-2025
Beskrivelse
Rogaland county would like to implement a research and development project together with Module Solutions Systems (MSS) for change of plates for bridges with a 100% composite system. This has never been done for vehicle bridges in Norway, and the aim of the project is to have the systems tested on several different bridge spans. Support has been sought from Innovasjon Norway the project and the application is being processed. The engineering design and execution of these bridges will form a foundation for standardisation of systems certified by the Directorate of Public Roads, which can be used by counties and municipalities nationwide. This will mean that the time for carrying out the necessary upgrades is considerably reduced, it becomes more sustainable (both in the form of material choices, increased reuse and reduced work, detouring, lifting etc.) and not to mention reduces the need for future maintenance. Description of the procurement: The background for the project is that a large number of Norwegian bridges have damage that increases the risk of traffic. Replacing these bad bridge plates with traditional methods is both expensive and time consuming. The current measures are often ineffective due to limited upgrading resources. Complete improvements are simply too expensive and time consuming. Composite plate replacement eliminates many of these problems. 1. Lower weight: Composite materials have significantly lower self-weight compared to traditional concrete slabs. This makes it easier to document reuse of the existing substructure and it can open for classification or expansions. Lower weight also means that smaller cranes can be used, which is advantageous on narrow roads with weight limitations. 2. Prefabricating: Composite bridges come prefabricated from the factory, eliminating the need to acquire or hire areas for casting the bridge plate. This reduces the time at the construction site, saves rigging and operation costs, and minimises traffic disadvantages. 3. Flexibility in design: Composite plates can be designed identically with concrete slabs and can have spans of up to 15 metres for a full Euro code load. They can be coated with asphalt elite layers to ensure normal operation of the road, or a lighter thin cover can be chosen for further weight reduction. 4. Transport and assembly: The size of the composite covers can be adapted to transport limitations and the entire plate can be delivered complete or joined in the longitudinal direction. 5. Sustainability: Our recent projects show a CO2 savings compared with concrete of more than 50% and steel of over 70% if the bridge superstructure is produced in composite. 6. Maintenance free: The composite plate is almost maintenance free and will not be corroded or degraded.
Les hele kunngjøringen og konkurransegrunnlaget hos TED · Om oppdragsgiveren (org.nr. 971045698)
Andre kunngjøringer fra ROGALAND FYLKESKOMMUNE
Kilde: TED – Tenders Electronic Daily, Den europeiske unions publikasjonskontor (© EU, gjenbruk tillatt med kildehenvisning). Viser kunngjøringer som er sendt til TED (over EØS-terskelverdiene); mindre anskaffelser finnes på doffin.no. Vi er ikke oppdragsgiver og tar ikke imot tilbud.